Build-Out
From ATXHackerspace
Contents |
New Location Build-Out
New Location Build-Out items TBA
Layout and placement of items
NEW PLAN NEEDS TO BE UPLOADED Note: This plan is highly subject to feedback and change. Check back frequently
Committee Laundry-list
- Install strike plates and door system - ACDC (see Tim or Martin)
- Install server rack and related computers - Networking Committee (see Tim)
- Procure 'fat pipe' internets service - Networking Committee (see Tim or Danny)
- Move and organize hand and power tools - Tool Committee (see Matt or Danny)
- Collect payments and organize space for Coworking space (see Matt or Tim)
- Basic questions regarding any of the above - ATX board (see Marshall, Jon, or Matt)
Contractor Laundry-list
General Contractor
note: ceiling tile and batting/insulation may be viable volunteer labor task
- Demo roll up doors and interior walls
- Drywall and spackle demolished walls
- Replace old ceiling tile, replace batting/insulation in areas of damaged tile
Concrete
- marking off and installing a code-compliant ramp for the ADA parking space
Flooring
note: Carpet and carpet glue removal may be viable volunteer labor task
- Cutting the carpet, cleaning the foor, and anchoring the carpet correctly, so that we can install laminate flooring for the kitchen. 146-sqft
- Cutting the carpet, cleaning the floor in the server room to allow us to drill and install racks and cabling
- Cutting the carpet, cleaning & polishing the floor in the workshop area with densifier
Electrical
- installing the correct 240v plugs for an electric range (exact placement to be delivered)
- installing a vent, and 110v outlet in the roof ready for attachment to our over-range vent hood
- installing the correct 240v plug for a dryer near the washer area
- installing GFI plugs for kitchen, bathrooms, and near-water areas around the washer
Plumbing
- plumbing in the drain and hot/cold taps for the washer
- plumbing in the drain, hot/cold taps for the kitchen sink
- plumbing in a box for cold water for the fridge (and possibly water cooler)
- installing ADA compliant fixtures and spacing for the bathrooms
- installing new sinks, low-flow toilets and fixtures in all bathrooms
- installing a commercial wet tile floor and floor drain in all bathrooms
- installing the drain and plumbing for the shower in the second bathroom
Roof
- installing a 12" vent in the roof for a roof fan over the dirty shop area
- installing same with fan for kitchen area
- installing vent with extraction fan for the laser cutter room
Air Conditioning
- Check-up and inspection - all four units